A number of weeks ago the sandbox in the back playground became an active excavation site.
Trenches for pipes were dug for the water system. Specific depths were then dug around this system to accommodate the foundation. All this was considered to make ready for the building of a hotel.
Previous
Next
The construction crew met together to formulate more concrete plans. After reading a book on how to build a house, the three crew members drew their ideas.
This is what we’ve done so far. We have dug the foundation. Ryan
We need all the sandbox. Brooke
So how bout we make a mini foundation? Ryan
So right now we have this. I’m drawing what we have so far. Ryan
I’m making the steps. Brooke
I’m making the elevation. Graeme